A standard home inspection in Washington State runs $350–$750, with the typical Seattle transaction landing near $500. That figure covers only the baseline visual evaluation — structural, mechanical, and electrical systems at the surface.

Seattle home inspections: choosing tests for your property

Seattle Home Inspection Options by Property Type

The inspection menu beyond the baseline is dictated by property type: age, plumbing material, fuel source, building configuration, and whether the structure floats. Buyers who apply a single checklist to a 1908 Capitol Hill craftsman, a South Lake Union condo, and a Lake Union floating home expose themselves to repair and remediation costs that can reach tens of thousands of dollars for a single missed defect — and no standard disclosure process catches them all.

A baseline inspection is a visual inventory. The property-specific inspections are the financial exposure assessment.

Essential Inspections for Single-Family Homes: Sewer Scopes and Oil Tank Sweeps

Two inspections carry disproportionate financial significance for Seattle single-family residences: the sewer scope and the underground storage tank (UST) sweep. Both target infrastructure that is structurally invisible during a standard walk-through, and both can surface liabilities that dwarf the cost of the inspection itself.

The timing matters. These inspections are most useful while the buyer still has an active inspection contingency, subject to the actual deadline written into the purchase and sale agreement. A buyer should not assume that ordering the inspection is enough; the report, follow-up questions, contractor estimates, and any proposed amendment or notice must fit inside the contract's timetable.

Sewer Scope: When and Why

Homes built before 1980 in Seattle frequently connect to side sewers composed of clay, concrete, or cast iron. Clay pipes — common in pre-war neighborhoods such as Ballard, Wallingford, and Capitol Hill — are jointed every two to three feet. Each joint is a potential root-intrusion point. Over decades, fine root tendrils penetrate the mortar or rubber gaskets sealing those joints, eventually forming dense root masses that obstruct flow. Cast iron, common in mid-century construction, corrodes from the inside out; the pipe wall thins until it perforates or collapses under soil load. Concrete pipes deteriorate through chemical attack from hydrogen sulfide gas, a byproduct of anaerobic bacterial activity in stagnant sewage.

A sewer scope costs $150–$450 and consists of a camera pushed through the side sewer lateral from a cleanout to the city main. The output is a video and a written report identifying pipe material, joint condition, root intrusion points, offsets, cracks, collapses, and the approximate distance to the wye connection at the city main. A useful report should make clear where the camera stopped and why. “Unable to reach the main” is not the same finding as “the line is clear.”

Experienced operators can estimate remaining pipe life based on wall condition and joint displacement, but that estimate is not a warranty. The practical value of the scope is that it gives the buyer a physical record of the line's condition and a basis for deciding whether to seek a specialist's repair proposal. A line with minor root intrusion may call for monitoring or cleaning. A collapsed section, belly, severe offset, or failing material may require excavation, trenchless work, or a more detailed engineering assessment.

The financial exposure is structural. Seattle homeowners generally own the side sewer all the way to the wye at the city main, including segments running under public sidewalks and streets. Repairs in those zones can trigger right-of-way permits, traffic control plans, and street restoration costs that push a single sewer replacement well above $15,000. If the lateral runs under a neighbor's property — not uncommon in Seattle's dense housing stock — easement questions can add legal costs and months of delay.

A buyer should ask the sewer-scope operator to identify the route, not just the pipe condition. The same defect has a different financial meaning depending on whether the line crosses a driveway, a public street, a retaining wall, or another owner's parcel. It is also worth checking whether prior repairs were partial. A newer section near the house does not establish that the entire lateral to the main has been replaced.

The scope does not automatically dictate one outcome. A defect may support a repair request, a credit, a price adjustment, or a decision to proceed with a clearly budgeted project. The contract controls what the buyer can do and when. After the inspection contingency expires, the buyer may still have rights depending on the seller's disclosures, representations, negotiated warranties, fraud or concealment, and other terms of the agreement. Those possibilities are not a substitute for inspecting the line while the contractual opportunity is open.

Oil Tank Sweep: Underground Heating Oil Liability

Seattle homes built before 1980 were frequently heated by fuel oil stored in buried steel tanks. The default decommissioning practice for decades was in-place abandonment — filling the tank with inert foam or sand and capping the fill and vent lines. Clean in-place decommissioning runs $700–$1,000. Full removal runs $5,000–$10,000. Soil remediation, required if tank corrosion has leaked petroleum hydrocarbons into surrounding soils, can exceed $100,000 depending on the extent of contamination and proximity to groundwater.

The challenge for buyers is that many decommissioned tanks left in the ground were never registered with the state, and documentation — if it exists at all — may be incomplete or missing from the seller's disclosure. A standard home inspection does not include an oil tank sweep. The sweep is a separate service, typically costing $150–$300, using ground-penetrating radar or magnetometer equipment to locate metallic anomalies consistent with buried tanks.

The result is not always conclusive. Landscaping, fences, buried utilities, reinforcing steel, and other metal objects can complicate the scan. If the technician identifies a suspicious area, the next step may be a targeted excavation or additional documentation review. A “no tank detected” result should be read within the limits of the equipment and site conditions, particularly where part of the yard is inaccessible.

Buyers should request historical fuel-delivery records, prior decommissioning documentation, and any environmental paperwork before closing. A seller's statement that an old tank was “taken care of” is not equivalent to a report showing how it was located, decommissioned, removed, or tested. If the property is in an area with a history of oil heat, the absence of paperwork is itself a reason to ask more questions.

Seattle buyers of pre-1980 single-family homes absorb two invisible liabilities — the side sewer under the street and the oil tank under the yard. The inspection menu must price both, or the closing does not.

Condo and townhouse transactions split inspection responsibility across two parties: the buyer evaluates the interior unit, while the homeowners association is typically responsible for some combination of the building envelope, structure, roof, and common systems. The exact boundary comes from the declaration, bylaws, maintenance rules, and insurance documents. It should never be inferred from the listing description or from what is customary in another association.

Misalignment between these scopes is a primary source of post-closing dispute. A buyer may purchase a beautifully renovated unit in a building with an aging roof, failing siding, or an underfunded elevator reserve. The unit inspection can be accurate and still tell only half the story.

Condominium Inspections: Interior-Only Scope

A Seattle condo inspection covers the unit interior — walls, ceilings, floors, appliances, plumbing fixtures, electrical panels serving the unit, windows where accessible, and HVAC components within the unit boundary. The building's roof, exterior siding, foundation, elevators, and central mechanical systems are often owned and maintained by the HOA, but the association documents determine the actual allocation of responsibility.

The financial substitute for a private exterior inspection is the HOA document package, particularly the reserve study. Washington associations may be required to maintain reserve studies and update them according to the governing statute and the association's circumstances. A professional reserve study with a visual site inspection evaluates projected capital expenditures over a long horizon and compares those needs with the association's current funding plan. It is not a guarantee that every defect has been found. It is a planning document, and its usefulness depends on its age, scope, assumptions, and whether the board acts on it.

A substantially underfunded reserve study signals elevated risk that the association will levy special assessments or increase dues to cover major repairs. Even a fully funded plan does not eliminate risk: construction defects, insurance losses, inflation, and newly discovered conditions can change the numbers. What the study does provide is a way to see whether the association is budgeting for the roof, siding, decks, plumbing, elevators, parking structure, windows, and other costly components — or simply postponing them.

Buyers should request:

  • The most recent reserve study and any update issued after it.
  • The association's current budget, financial statements, and reserve-account information.
  • Minutes from the last 24 months of board meetings.
  • Notices of pending or recently completed special assessments.
  • The declaration, bylaws, rules, maintenance matrix, and insurance summary.
  • Records of major repairs, engineering reports, warranties, and open permits where available.
  • Information about litigation, insurance claims, and any known construction-defect allegations.

Board minutes often disclose maintenance issues, repair disputes, water intrusion, failed inspections, and pending litigation that the reserve study does not capture. Look for repeated references to the same problem. “Discussed again” may be more informative than a single dramatic line in an old engineering report. A well-run association documents its problems and addresses them with reserve funds; a poorly run one defers maintenance, borrows against future assessments, or both.

Townhouse Due Diligence: Shared Side Sewer Laterals

Townhouse inspections in Seattle fall between single-family and condo scope. The interior is inspected as a single-family home. The exterior envelope and roof may be HOA-maintained, individually maintained, or divided by component, depending on the association's declaration. The buyer needs the governing documents to know which result applies.

What catches many buyers off guard is the sewer lateral. Townhouses in Seattle frequently share a side sewer with adjacent units, and defects in shared lines create joint liability among all connected owners. The association may have a repair protocol, but responsibility can also be allocated through easements, declarations, or agreements among the owners.

Documenting the line's condition at the time of purchase establishes a baseline for apportioning future repair costs. If the scope reveals a deteriorating shared lateral, the buyer has leverage to negotiate a repair credit, escrow holdback, seller-funded repair, or a written agreement addressing the work before closing. The appropriate remedy depends on the defect, the number of connected owners, the association's rules, and the contract.

The cost is similar to a single-family scope: $150–$450. Skipping it means inheriting an unknown share of a potentially expensive underground repair, with no contemporaneous video to establish whether the condition was already present. It also leaves unanswered a practical question: who has authority to order the repair, access the line, and approve work that crosses multiple lots?

The Reserve Study Reading Protocol

A reserve study deserves more than a glance at the “funding percentage.” Read it against the physical building and the board's recent decisions.

Document SectionData PointDecision Trigger
Funding planCurrent reserves compared with projected capital expendituresA substantial shortfall signals elevated special-assessment or dues-increase risk; ask whether corrective funding is planned
Reserve study ageDate of the last visual site inspection and updateAn older study may not reflect current roof, siding, deck, elevator, or plumbing conditions
Component listRemaining useful life and replacement cost for major systemsNear-term replacement with little money reserved deserves a closer financial review
Special assessmentsItemized assessments and their payment statusConfirm the amount, purpose, due dates, and whether the buyer could assume any unpaid balance
Board minutesRepeated references to leaks, repairs, litigation, or contractor disputesA recurring problem may be more significant than a single completed maintenance item
Insurance coverageMaster-policy limits, deductibles, exclusions, and claim historyA high deductible or coverage gap can create substantial owner exposure after a loss
Litigation and claimsActive lawsuits, construction-defect allegations, and unresolved insurance claimsObtain legal and title review before treating the issue as a routine inspection item

A reserve study is not a substitute for reading the resale certificate and other association disclosures. Nor does it transfer the HOA's risk to the seller automatically. The buyer's ability to request documents, object, terminate, or negotiate depends on the transaction documents and their deadlines.

In a condo transaction, the HOA reserve study is the buyer's exterior inspection. Skipping it does not eliminate exterior liability — it removes the buyer's ability to price it.

Specialized Marine Surveys for Seattle Floating Homes and Houseboats

Seattle's floating residences are not one category of property. Floating homes are permanently tied to moorages and treated as residences under a different regulatory framework; houseboats, formally classified as Floating On-Water Residences (FOWRs), are registered as vessels. Each requires a distinct inspection menu, and confusing the two can leave critical systems uninspected.

A standard residential inspector is not automatically qualified to assess a hull, flotation system, moorage connection, or underwater fitting. The buyer should confirm the inspector's experience with the specific structure before treating a report as complete.

Floating Home Inspections: Standard Plus Dive

A floating home inspection combines a standard residential inspection with a specialized underwater dive inspection. The dive evaluates the flotation system — often foam-filled pontoons or concrete floats — for water intrusion, material degradation, cracking, displacement, and structural separation between float modules.

Waterlogged foam pontoons lose buoyancy incrementally, causing the structure to sit lower in the water and stressing connections to the moorage's utility infrastructure. Water lines, electrical conduit, and sewer connections all flex and fatigue as the home settles unevenly. A structure can look sound from the deck while the most consequential deterioration is below the waterline.

Depending on the flotation system design, some repairs or partial replacements are feasible. In other configurations, particularly older solid-concrete systems, degradation may be so pervasive that effective repair requires replacing a large portion or the entire float platform. That project can approach or exceed the value of the home itself. The dive report should identify the flotation material, current condition, visible defects, access limitations, estimated remaining service life where that estimate is supportable, and recommendations for monitoring or remediation.

The inspection should also account for the connection between the structure and the moorage. Utility penetrations, shore power, flexible connections, pilings, walkways, and decking can create distinct maintenance obligations. The moorage agreement may assign some of these costs to the owner and others to the moorage association. That division is as important to the budget as the condition of the float.

Buyers should confirm the moorage's cutoff date for FOWR verification and review the property's regulatory records. Seattle has applied a cutoff date of July 1, 2014, for verifying that floating structures meet the regulatory definition of a floating home rather than a vessel. Structures failing verification may be subject to removal under shoreline regulations. This is a land-use compliance issue, not just an inspection issue, and it cannot be remedied by replacing a damaged component.

Houseboat Inspections: Haul-Out Protocol

Houseboats require periodic haul-out inspections, typically every 3–7 years depending on the vessel's age, hull material, use, and the surveyor's recommendations. A five-year interval can therefore still fall within a normal maintenance cycle. The absence of a haul-out record for five years is not, by itself, proof of deferred maintenance. It is a prompt to examine the actual history, the vessel's condition, and the recommendations from the last survey.

The haul-out allows a marine surveyor to inspect the hull, through-hull fittings, propulsion systems, underwater structural members, sacrificial anodes, bottom paint, and areas that are invisible from the dock. The condition of the paint system and anodes should be interpreted together with the hull material and the vessel's environment. A recent haul-out with documented repairs may be more informative than an older report that simply states the vessel was removed from the water.

Haul-out cost allocation follows market convention in Seattle, but the transaction documents control the final arrangement. The buyer commonly pays for the surveyor and the haul-out itself, while the seller may pay for towing to and from the boatyard. The parties should agree in writing on scheduling, access, responsibility for damage during movement, and what happens if the boatyard identifies a condition requiring additional work.

The buyer should request:

  • The complete haul-out and maintenance history.
  • Prior marine survey reports, including recommendations that were deferred.
  • Receipts or records for hull work, anodes, bottom paint, seacocks, and propulsion repairs.
  • Mooring and utility agreements.
  • The remaining moorage lease term, renewal provisions, annual fees, and transfer requirements.
  • Rules governing vessel condition, inspections, insurance, and owner improvements.
  • Registration and title documents applicable to the vessel.

A moorage lease with fewer than 10 years remaining can fundamentally change the value calculation. Reassignment or renewal terms may not carry over to a new owner at the same rate, and a buyer should not assume that a favorable arrangement is automatically transferable. For a floating property, the home and its place in the water are economically linked. Inspecting one without reviewing the other leaves the valuation incomplete.

Phased Inspection Strategies for New Construction Projects

New construction purchases in Seattle are best inspected in phases. Each phase targets a stage of the build where defects are most economically corrected — and where the cost of missing a defect escalates most steeply.

The buyer should clarify in advance whether the builder will permit independent inspections, what notice is required, whether the inspector may access the site with the buyer's agent, and how inspection findings will be documented. A builder's municipal inspection record is important, but it is not the same as an independent inspection performed for the buyer's interests.

Phase 1: Pre-Foundation Inspection

This inspection takes place after excavation, formwork, and rebar placement but before concrete is poured. The inspector verifies footing depth and width, rebar sizing and spacing against the structural engineer's plans, vapor-barrier installation, anchor-bolt placement, and formwork alignment with the foundation layout. Soil conditions matter: Seattle's glacial till varies widely by neighborhood, and improper compaction or inadequate bearing soil can lead to differential settlement that cracks foundations and framing years after closing.

The inspection is most valuable when the relevant plans are available. Without the structural drawings and foundation details, the inspector can document visible conditions but has less ability to compare field installation with design intent. Photos should identify locations clearly enough that the builder and engineer can return to the same area.

Defects at this stage require excavation and re-pour. The same defect discovered after the foundation is poured, the framing is erected, and mechanical systems are roughed in demands far more invasive — and far more expensive — correction. Breaking out and repouring a foundation section beneath an occupied or finished structure is an entirely different project from correcting formwork before the first truck arrives. The pre-pour inspection is the highest-leverage inspection in the new-construction sequence.

Phase 2: Pre-Drywall Inspection

The pre-drywall inspection occurs after framing, rough plumbing, rough electrical, and HVAC installation but before drywall is hung. The inspector verifies structural framing, including fastening, bearing points, shear-wall nailing patterns, and required blocking. The review also covers mechanical routing, electrical-panel placement, insulation installation, fire blocking in wall cavities, and visible flashing at windows, doors, roof-to-wall transitions, decks, and penetrations.

Flashing details deserve particular attention in Seattle's wet climate. Once drywall and exterior cladding conceal the work, a missing sill pan, incomplete head flashing, or poorly integrated membrane can remain invisible until moisture has damaged sheathing and framing. The same is true of plumbing penetrations, duct connections, and electrical work that is difficult to access after finishes are installed.

Defects concealed after this point cannot be inspected without demolition. A missing piece of fire blocking or an improperly flashed window opening becomes a latent defect that may not manifest for years. Moisture intrusion behind cladding, for instance, can silently rot sheathing and framing before a soft spot appears on an interior wall. By then, the builder's warranty position may be disputed, and the repair scope can include both the original defect and cascading damage.

Phase 3: Final Walkthrough

The final inspection is conducted at substantial completion. The inspector verifies finish quality, appliance operation, fixture installation, visible plumbing leaks, heating and cooling operation, paint and trim work, drainage, and compliance with the purchase agreement's specifications. Punch-list items identified at this stage should be recorded with photographs, locations, and a clear description of the requested correction.

This phase catches cosmetic and functional defects, but it cannot access anything behind the walls or beneath the slab. A clean final walkthrough does not erase the value of the earlier inspections. It confirms that the finished building operates as represented; it does not prove that concealed work was installed correctly.

Buyers of new construction should negotiate a contingency period that runs through the relevant inspection phases, subject to the builder's contract and the actual deadline. There is no universal Seattle rule that makes an inspection contingency ten business days. The number of days, the triggering event, notice requirements, and available remedies are contract-specific. A buyer should rely on the written agreement rather than an assumed market standard, and should allow time for the inspector's report and a meaningful response.

Rescinding at pre-foundation or pre-drywall is materially less costly than reaching the final walkthrough with unresolved structural or waterproofing concerns, where the buyer's leverage may be limited to the punch list and the possibility of a delayed closing. Builders are generally more responsive to correction requests made when the defect is visible and accessible than to claims made after the structure is closed in.

Managing Financial Risks: PLIA Assistance and Liability for Underground Infrastructure

The financial exposure from inspection failures follows a tiered structure. Tier 1 covers surface-level defects visible during a standard walk-through — an aging water heater, a leaking fixture, a damaged handrail, or an electrical defect that can be documented and priced during the inspection contingency. Tier 2 covers subsurface or concealed defects discoverable through property-specific inspections — a failing sewer lateral, an abandoned oil tank, contaminated soil, or a buried drainage problem. Tier 3 involves regulatory, association, or title-related exposure that may not be solved by a contractor's estimate at all.

The farther a problem sits from the visible structure, the more important it becomes to identify the responsible party, the governing document, and the deadline for action.

PLIA Assistance and Oil-Tank Documentation

The Washington State Pollution Liability Insurance Agency (PLIA) may provide assistance and technical resources related to heating-oil tanks and petroleum contamination. Buyers should treat PLIA records and assistance as part of the investigation, not as an automatic promise that every cleanup cost will be covered. Eligibility, documentation, the responsible party, and the nature of the release all matter.

A buyer investigating a suspected tank should assemble the available record:

1. Ask the seller for tank-sweep results, decommissioning certificates, removal records, invoices, and environmental reports.

2. Compare those documents with the physical layout of the property, including former fill and vent locations.

3. Determine whether the tank was removed, abandoned in place, or merely disconnected from the heating system.

4. If contamination is suspected, obtain advice from an environmental professional and review available PLIA procedures before treating the problem as a routine closing repair.

5. Make sure any negotiated cleanup obligation identifies the scope of work, contractor, permits, testing, completion standard, and responsibility if additional contamination is found.

The key distinction is between finding a tank and resolving a release. A sweep locates an anomaly. Decommissioning addresses the tank. Soil testing determines whether petroleum has migrated. Remediation addresses the contamination. Each step can produce a different cost and a different set of legal responsibilities.

Who Owns the Underground Risk?

For a side sewer, ownership and maintenance obligations may extend beyond the lot line to the city connection. For a shared townhouse lateral, the declaration or easement may allocate costs among several owners. For an oil tank, responsibility can involve the current owner, a prior owner, a seller's representations, environmental statutes, and the facts surrounding the release. For a condo, the association's governing documents may place a common line or exterior component in the HOA's maintenance scope while still allowing an assessment against individual owners.

That is why a report alone is not a risk-management plan. After an adverse finding, the buyer should ask four practical questions:

  • What exactly is defective, and where is it located?
  • Who has the legal or contractual responsibility to repair it?
  • What will the repair cost under the site's access and permitting conditions?
  • What action is available before the relevant contract deadline?

The fourth question is often overlooked. A buyer may receive a sewer video on the last day of the contingency and discover that a contractor cannot inspect the property for another week. The existence of a defect does not automatically extend the deadline. The buyer's agent and attorney, where appropriate, need to review the agreement and communicate promptly.

Contract Deadlines and Post-Contingency Remedies

Seattle transactions commonly use negotiated inspection deadlines. The relevant period may be expressed in a number of days, may run from mutual acceptance or another contract event, and may include specific procedures for notice, seller response, termination, or amendment. It is the actual contract deadline — not a presumed “standard” ten-business-day period — that governs the buyer's immediate inspection rights.

Buyers should schedule specialized inspections early enough to leave room for:

  • A second visit or clarification from the inspector.
  • A contractor's estimate for a significant repair.
  • Review of association, title, or environmental documents.
  • Negotiation of a credit, price change, repair obligation, or escrow arrangement.
  • Delivery of any required written notice before the contingency expires.

A buyer who proceeds after the contingency deadline is not necessarily without recourse. Potential remedies can depend on the seller's written disclosures, representations, contractual warranties, fraud or intentional concealment, statutory duties, and other provisions of the transaction. They may also depend on what the buyer knew, what was observable, and what the agreement says about reliance and limitations. None of those possibilities is automatic, and pursuing them after closing is usually more expensive and fact-dependent than investigating the condition before closing.

The right editorial posture for a buyer is neither panic nor false reassurance. A sewer defect does not make every house unbuyable. A reserve shortfall does not prove that an assessment is imminent. A five-year gap between houseboat haul-outs does not establish neglect when the recommended interval is commonly 3–7 years. The point of specialized inspection is to replace assumptions with evidence while the buyer can still act on it.

The inspection contingency is a decision window, not a magic shield. It protects the buyer only to the extent that the buyer identifies the right risk, meets the written deadline, and responds through the contract.

Matching the Inspection to the Property

The most efficient Seattle inspection strategy begins with the property's physical and legal profile, not with a generic package sold by an inspector. Before making an offer, or immediately after mutual acceptance, identify the features that change the risk:

  • Age and heating history: Older single-family homes may justify both a sewer scope and an oil-tank sweep, especially when records are incomplete.
  • Pipe material and route: Clay, cast-iron, concrete, shared, or street-running laterals deserve more attention than a short, recently replaced line with complete documentation.
  • Association structure: A condo or townhouse requires document review in addition to the unit inspection. The declaration determines whether a roof, siding system, exterior wall, or sewer line is a common responsibility.
  • Waterfront status: A floating home needs a dive inspection and moorage review; a houseboat needs a marine survey and a haul-out history.
  • Construction stage: New construction should be inspected before the foundation pour, before drywall, and at completion when access is available.
  • Contract timing: Every report must be obtained early enough for the buyer to use the rights actually provided by the agreement.

The primary keyword — Seattle home inspection options by property type — is not merely a search phrase. It describes the central practical reality of the transaction. There is no single “complete” inspection that sees through a basement slab, a shared sewer, an HOA balance sheet, a floating platform, and a newly framed wall cavity at the same time.

A baseline inspection still matters. It establishes the condition of the visible building and often identifies clues that point toward additional testing. But the most expensive defects in Seattle real estate are frequently the ones a baseline inspection is not designed to find. The buyer's task is to connect the property type to the hidden system, then connect that system to the contract deadline and the person responsible for the repair.

That is how an inspection becomes useful due diligence rather than a stack of reports: the right specialist, at the right stage, with enough time to turn a finding into a decision.

FAQ

What is the difference between a standard home inspection and a sewer scope?
A standard inspection is a visual evaluation of structural, mechanical, and electrical systems. A sewer scope is a specialized service using a camera to inspect the underground lateral pipe for cracks, root intrusion, or collapses.
Why should I get an oil tank sweep for a home built before 1980?
Homes from this era often used buried steel heating oil tanks. If a tank leaks, soil remediation costs can exceed $100,000, and a standard inspection will not detect these buried liabilities.
How do I know if an HOA is financially healthy?
Review the association's reserve study to see if projected capital expenditures are adequately funded. A substantially underfunded study signals a high risk of future special assessments or dues increases.
Why is a pre-drywall inspection important for new construction?
This inspection allows you to verify structural framing, flashing, and mechanical routing before they are permanently concealed by drywall. Once walls are closed, defects like missing fire blocking or poor flashing are difficult and expensive to fix.
Do I need a special inspection for a floating home?
Yes, you need a specialized underwater dive inspection to evaluate the flotation system. Standard inspectors are generally not qualified to assess the integrity of pontoons or concrete floats, which are critical to the home's stability.